RWE are planning to install a hydro scheme on the river Conwy near Betws-y-Coed in North Wales. The plan is to abstract up to 6m³/s of the water in the Conwy, above Penmachno bridge, and divert it through ~2km of pipelines before returning it below the confluence with the Lledr. This section of river is …