Pyranha Logo
facebook twitter vimeo

Tag Archive: Hydro

07
Jan

Glen Etive Hydro Schemes: Act Now!

The developer has resubmitted its plans for hydro schemes on the Allt Mheuran and Allt Fhaolain; click the link to find out how to submit an objection.

05
May

Save the Conwy – Action required!

RWE are planning to install a hydro scheme on the river Conwy near Betws-y-Coed in North Wales. The plan is to abstract up to 6m³/s of the water in the Conwy, above Penmachno bridge, and divert it through ~2km of pipelines before returning it below the confluence with the Lledr. This section of river is …

Continue reading »